成人性生交大片免费观看软件苹果,715824成人免费看A片,国产 成年妇 视频,欧美性生交A片免费看,国产美女裸体无遮挡免费视频网站

Press & report

Is Your Photovoltaic Power Station Ready For Summer?

The turn of spring and summer is a period of frequent strong convective weather, and the subsequent hot summer is accompanied by high temperature, heavy rain and thunder and other weather, and the photovoltaic power station on the roof has undergone multiple tests. So, how do we usually take countermeasures to ensure the stable operation of photovoltaic power plants and ensure profits?


For summer heat

1. Pay attention to cleaning and cleaning the shelters on the power station, so that the components are always in a state of ventilation and heat dissipation.

2. Please clean the power station in the early morning or evening, avoid exposure to the sun and high temperature at noon and afternoon, because the sudden cooling will cause the temperature difference of the glass plate of the module, and there may be cracks on the surface of the panel. Therefore, it is necessary to choose early morning and evening when the temperature is lower.

photovoltaic

3. High temperature may cause the aging of the internal components of the inverter, so it is very important to ensure that the inverter has good ventilation and heat dissipation conditions. The inverters are basically installed outdoors. During installation, SKYWORTH puts the inverters in a cool place to avoid direct sunlight, such as the back of the module and under the eaves. A cover plate will be added for outdoor installations to fully ensure the ventilation of the inverters. and heat dissipation.


Rainstorm for summer

A lot of rainwater will soak the cables and components, which will reduce the insulation performance. If it is damaged, it will directly lead to the inability to generate electricity.

If your house has a sloping roof, it will have a strong drainage capacity, please don't worry;

3

If it is a flat roof, frequent inspections of the power station are required. Note: During inspection operation and maintenance in rainy days, avoid electrical operations with bare hands, do not directly touch the inverter, components, cables, and terminals, etc., you need to wear rubber gloves and rubber boots to reduce the risk of electric shock.


Lightning for summer

The lightning protection facilities of photovoltaic power plants should also be checked regularly. In the current lightning protection measures, the most effective and extensive method is to connect the metal parts of electrical equipment to the ground. The grounding system consists of four parts: grounding equipment, grounding body, lead-in wire and earth.

4

Avoid repairing electrical equipment and circuits with bare hands, wear insulating rubber gloves, beware of the risk of electric shock, and take measures to prevent high temperature, rainstorm, typhoon, and lightning strikes. It should be noted that Skyworth Photovoltaic and PICC have purchased exclusive comprehensive insurance for each power station to escort the power station, and users do not need to bear the risk for damage caused by natural disasters.


FACEBOOK

  • Pre sales consultation
  • After sales consultation

customer service

Linkedin

  • Pre sales consultation
  • After sales consultation

customer service

CONTACT US

  • Pre sales consultation
  • After sales consultation

customer service

Whatsapp

return

Sweep the official account

亚洲欧美日韩在线 | 日本強姦少婦一級A片中文字幕 | 欧美婬乱片A片AAA毛片地址 | 在线内射学生妹v | hitomi一区二区 | 中文字幕视频入口导航 | 亚洲亚洲人成综合网络 | 久久成人免费精品视频 | 特级大胆西西4444人体 | 国产精品永久免费 | av影音先锋在线播 | 国产高清无码自拍 | 成人免费视频 网站在线观看 | 四川妇BBB桑BBB桑BBB | 中文在线字幕观看电视剧 | 一级毛片a一级毛片免费看黄道婆 | 亚洲无码AAAA~ | 日本丰满少妇无码AAA片软件 | 免费观看欧美精品网站 | 17c成人永久免费视频 | 蜜桃AV一区二区 | 少妇一级淫片免费放 | 真人午夜一级AV毛片免费观看 | 国产第一页入口屁屁 | 亚洲综合精品成人APP啪啪游戏 | 欧美一区二区三区五月天婷婷 | 蜜乳AV少婦中年豐滿一区二区 | 69人人桑人人妻 | 国产乱人妻精品秘 入口制 91人妻人人澡人人爽精品 | 国产乱XXⅩXX国语对白 | 亚洲在线观看视频网站无码高清 | 成人午夜福利无码视频专区 | 中文字幕一区二区三区乱码人妻 | 精品不卡一区二区 | 专干老熟女300部- | 少妇高潮惨叫久久麻豆传 | 91久久精一区二区三区中文字幕 | A片免费在线观看 | 国产福利在线观看视频_国产福利91 | 亚洲AV无码秘 蜜桃永瀬ゆい | 国产麻豆乱码精品一区二区三区 |