成人性生交大片免费观看软件苹果,715824成人免费看A片,国产 成年妇 视频,欧美性生交A片免费看,国产美女裸体无遮挡免费视频网站

Press & report

Is Your Photovoltaic Power Station Ready For Summer?

The turn of spring and summer is a period of frequent strong convective weather, and the subsequent hot summer is accompanied by high temperature, heavy rain and thunder and other weather, and the photovoltaic power station on the roof has undergone multiple tests. So, how do we usually take countermeasures to ensure the stable operation of photovoltaic power plants and ensure profits?


For summer heat

1. Pay attention to cleaning and cleaning the shelters on the power station, so that the components are always in a state of ventilation and heat dissipation.

2. Please clean the power station in the early morning or evening, avoid exposure to the sun and high temperature at noon and afternoon, because the sudden cooling will cause the temperature difference of the glass plate of the module, and there may be cracks on the surface of the panel. Therefore, it is necessary to choose early morning and evening when the temperature is lower.

photovoltaic

3. High temperature may cause the aging of the internal components of the inverter, so it is very important to ensure that the inverter has good ventilation and heat dissipation conditions. The inverters are basically installed outdoors. During installation, SKYWORTH puts the inverters in a cool place to avoid direct sunlight, such as the back of the module and under the eaves. A cover plate will be added for outdoor installations to fully ensure the ventilation of the inverters. and heat dissipation.


Rainstorm for summer

A lot of rainwater will soak the cables and components, which will reduce the insulation performance. If it is damaged, it will directly lead to the inability to generate electricity.

If your house has a sloping roof, it will have a strong drainage capacity, please don't worry;

3

If it is a flat roof, frequent inspections of the power station are required. Note: During inspection operation and maintenance in rainy days, avoid electrical operations with bare hands, do not directly touch the inverter, components, cables, and terminals, etc., you need to wear rubber gloves and rubber boots to reduce the risk of electric shock.


Lightning for summer

The lightning protection facilities of photovoltaic power plants should also be checked regularly. In the current lightning protection measures, the most effective and extensive method is to connect the metal parts of electrical equipment to the ground. The grounding system consists of four parts: grounding equipment, grounding body, lead-in wire and earth.

4

Avoid repairing electrical equipment and circuits with bare hands, wear insulating rubber gloves, beware of the risk of electric shock, and take measures to prevent high temperature, rainstorm, typhoon, and lightning strikes. It should be noted that Skyworth Photovoltaic and PICC have purchased exclusive comprehensive insurance for each power station to escort the power station, and users do not need to bear the risk for damage caused by natural disasters.


FACEBOOK

  • Pre sales consultation
  • After sales consultation

customer service

Linkedin

  • Pre sales consultation
  • After sales consultation

customer service

CONTACT US

  • Pre sales consultation
  • After sales consultation

customer service

Whatsapp

return

Sweep the official account

爽 好久久久欧美精品 | 免费观看黄色视频网站 | 三上悠亚AV一区二区三区 | 久久久久久无码精品亚洲日韩麻豆 | 黄色无码在线免费观看 | 国产 成人妇 视频 精品一区二区三区视频 | 中文字幕妇偷乱视频在线观 | 亚洲电影一区二区三区在线播放 | 男女无遮挡XX00动态图120秒 | 免费一级全黄少妇性色 | 国产免费一区二区三区免费视频 | 亚洲成人无码久久久 | 国产喷水视频在线观看 | 国产在线拍揄自揄拍无码视频 | 亚洲无码国产精品 | 红桃成人无码免费网站 | 国产AV无码一区 | 免费看一级一级人妻片 | 国产乱子伦视频二区三区最新章节 | 又爽又黄A片免费观看直播蜜桃 | 国产精品高潮久久AV无码 | 性生交大片免费看A片苹果 丰满人妻偷人被强公中字幕 | 亚洲AV人人爽人人夜夜爽太夜夜操 | 久久久91人妻无码精品蜜桃hd69 | 久久久久久久久久成人永久免费视频 | 中文字幕一区二区三区在线无码 | 久久AV无码乱码A片无码 | 黄色成人网站入口 | ,亚洲AV午夜精品无码专区 | 欧美性爱 大香蕉 | 妃光莉妃ひとみ无码 | 男人的天堂av直线播放 | 国产一级a毛一级看免费视频 | 无码粉嫩虎白一线天在线观看视频 | 国产伦精品一区二区三区竹菊影视 | 夜夜嗨亚洲AV成人综合网破壞 | 17C丨国产丨精品永久入口 | 亚洲精品在线观看视频 | 高跟鞋白丝芭蕾舞亚洲AV无码 | 极品少妇自慰久久久 | 成人无码一二三产区入口 |